Fort Donelson ME 2 Playground

Made in USA
Future Play PlaygroundsSKU: ME2-4633-TR Lead Time: 14 to 16 Weeks

Our ME 2 Models are designed with easier access, lower decks, and more contained play, so even those younger children can join in the fun. Next time a little one asks, Me too? I play too?" These playground models allow you to say, "Yes, you too!!" All playgrounds are commercial grade units, even for residential installations, and can be installed in a matter of hours. For free-standing systems, on-ground support system allows you to move it around if desired.

See your choice of colors here.

Price:
Sale Price$9,409.99

Shipping calculated at checkout

Notify Me When Available
  • 6-Crayon Tower (1)
  • 4-Crayon Tower (2)
  • 2' Play Deck (3)
  • 3' Play Deck (2)
  • Tube Slide (1)
  • 6' Slide (3)
  • Slide Entrance Panel (3)
  • Crayon Picket Panel (1)
  • Bubble Panel (2)
  • Dino Panel (1)
  • Chalkboard Panel (1)
  • Crawl Tunnel from 2'deck to 3'deck 30" diameter (1)
  • Play Deck (1)
Age Range 2 to 12 years old
Equipment Weight 1300 lb
Deck Height 60 in
Fall Height 60 in
Installed Dimensions 41 ft x 16 ft x 8 ft
Slide Count 3
Made In USA
Lead Times
  • Please check the "Ships In" lead time above for this particular product -- many of our commercial play equipment items are made to order
  • Once the item has shipped, you will receive a tracking number and important instructions for unloading
  • Ship dates are a best estimate and not guaranteed
  • Shipments can take up to 10 days in transit
  • Products that are ordered from the same manufacturer will ship according to the longest lead time for those products. If a quick ship product is required to ship sooner, please let us know, though you may be required to pay extra for separate shipments.
Receiving
  • Every order with complex shipping requirements receives shipping instructions.
  • Unless a loading dock is readily available, this equipment ships via curbside delivery.
  • Commercial play systems generally benefit from having a forklift for unloading, which is typical in the industry.
  • There are many instances where the crates and pallets can be pulled apart by hand and unloaded as well, but a forklift is generally the quickest way to unload the product and is what trucking companies recommend to avoid possible detention charges (unloading that takes more than 3 hours)
  • Please see our FAQ and Shipping Policy for more information.

Payment & Security

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.