Fort Livingston Playground

Quick Ship Made in USA
Future Play PlaygroundsSKU: FP-6413D-TR Lead Time: 14 to 16 Weeks

Children of different ages and stages of development have different needs and abilities. This multi-height deck model uses a combination of deck heights and activities to provide challenging fun for those from 2 to 12 years old. Made of recycled plastic.

See your choice of colors here.

Price:
Sale Price$8,202.99

Shipping calculated at checkout

Notify Me When Available
  • 6-Crayon Tower (2)
  • Pyramid Roof (1)
  • 5' Play Deck (1)
  • 3' Play Deck (2)
  • 2' Play Deck (1)
  • Short Vertical Climber from 3' deck to 5' deck (1)
  • Crayon Loop Climber (1)
  • Activity Panel (1)
  • commercial applications - steering wheel
  • residential applications- periscope
  • 10' Slide (1)
  • 6' Slide (1)
  • Slide Entrance Panel (2)
  • Crayon Picket Panel (1)
  • Tic Tac Toe Panel (1)
  • Chalkboard Panel (1)
  • Picture Panel(1)
  • Climbing Wall (1)
  • 83" Straight Crawl Tube 30" diameter (1)
  • Molded Step to 2' Deck (1)
  • Tower Supports (4)
Age Range 2 to 12 years old
Equipment Weight 1300 lb
Deck Height 60 in
Fall Height 60 in
Installed Dimensions 7 ft x 16 ft x 12 ft
Slide Count 2
Lead Times
  • Please check the "Ships In" lead time above for this particular product -- many of our commercial play equipment items are made to order
  • Once the item has shipped, you will receive a tracking number and important instructions for unloading
  • Ship dates are a best estimate and not guaranteed
  • Shipments can take up to 10 days in transit
  • Products that are ordered from the same manufacturer will ship according to the longest lead time for those products. If a quick ship product is required to ship sooner, please let us know, though you may be required to pay extra for separate shipments.
Receiving
  • Every order with complex shipping requirements receives shipping instructions.
  • Unless a loading dock is readily available, this equipment ships via curbside delivery.
  • Commercial play systems generally benefit from having a forklift for unloading, which is typical in the industry.
  • There are many instances where the crates and pallets can be pulled apart by hand and unloaded as well, but a forklift is generally the quickest way to unload the product and is what trucking companies recommend to avoid possible detention charges (unloading that takes more than 3 hours)
  • Please see our FAQ and Shipping Policy for more information.

Payment & Security

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.