Great Smokies WillyGoat Playground

Quick Ship Made in USA
SportsPlaySKU: 15947 Primary Lead Time: 10 to 12 Weeks

A WillyGoat exclusive playground system!

Playground includes 3' transfer station, 3' triple rail slide, 90 degree slide, 3 guard walls, bubble panel, bench panel, mirror panel, horizontal ladder, vertical climber, 2 pyramid roof, 3 8' kick plate, 4' stepladder with arch entry, and 6' spiral slide.

Color options with an asterisk (*) denote a longer lead time. Please contact us if you'd like to customize the colors of your play system beyond the drop-down options.

Color: Primary
Price:
Sale Price$30,367.00

Shipping calculated at checkout

  • 3' Triple Rail Slide
  • 90 Degree Slide
  • 3 Guard Walls
  • Bench Panel
  • Mirror Panel
  • Horizontal Ladder
  • Vertical Climber
  • 3 8' Kick Plates
  • 4' Step Ladder
  • 6' Spiral Slide
  • Pyramid Roof
  • Bubble Panel
  • Choose your own colors! See all available colors here
Age Range 5 to 12 years old
Equipment Weight 2000 lb
Installed Dimensions 25 ft x 22.5 ft
Use Zone 37 ft x 34.5 ft
Slide Count 4
Customize
  • Choose your own colors! See all available colors here
Lead Times
  • Please check the "Ships In" lead time above for this particular product -- many of our commercial play equipment items are made to order
  • Once the item has shipped, you will receive a tracking number and important instructions for unloading
  • Ship dates are a best estimate and not guaranteed
  • Shipments can take up to 10 days in transit
  • Products that are ordered from the same manufacturer will ship according to the longest lead time for those products. If a quick ship product is required to ship sooner, please let us know, though you may be required to pay extra for separate shipments.
Receiving
  • Every order with complex shipping requirements receives shipping instructions.
  • Unless a loading dock is readily available, this equipment ships via curbside delivery.
  • Commercial play systems generally benefit from having a forklift for unloading, which is typical in the industry.
  • There are many instances where the crates and pallets can be pulled apart by hand and unloaded as well, but a forklift is generally the quickest way to unload the product and is what trucking companies recommend to avoid possible detention charges (unloading that takes more than 3 hours)
  • Please see our FAQ and Shipping Policy for more information.

Estimate Shipping

Payment & Security

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.